THE SHELBY COUNTY COMMISSION
NORTH-SOUTH CONNECTOR
PHASE 2
ADDENDUM NO. 1
TO: ALL PROSPECTIVE CONTRACTORS AND SUPPLIERS
The changes, modifications, clarifications and/or additions covered by and set forth in this
Addendum No. 1 shall become part and be incorporated in the Specifications, Contract
Documents, Bid Documents, and Plans for the above referenced project. The Contractor shall
include this Addendum as well as any previous and subsequent addenda that may be issued with
his proposal Bid Documents as indicating his receipt and acceptance of its terms, requirements,
and clarifications.
The Contractor shall also acknowledge receipt of this addendum on page BD-16 of the
Specifications-Contractual Documents.
SPECIFICATIONS:
- Re: Page BD-7 List of Material Suppliers and Equipment Manufacturers
Revision: Add McWane Pipe
- Re: Page SP-14 Special Provisions for Owner Approved Suppliers and Equipment
Manufacturers
Revision: Add McWane Pipe
DRAWINGS:
- Re: Plan and Profile Sheet 4
Clarification: Add a 10” MJ gate valve at the 36”x 10” tee on Connection 2 at Chelsea
Park Road.
LIST OF MATERIAL SUPPLIERS AND EQUIPMENT MANUFACTURERS
The base Material Supplier or Equipment Manufacturer is listed in bold directly to the
right of the type of material or equipment.
Equipment or Material Name of Supplier or Manufacturer
Ductile Iron Pipe U.S. Pipe, American, McWane Pipe
Ductile Iron Fittings ______________________________
Butterfly Valves ______________________________
Resilient Seated Gate Valves ______________________________
Air Relief Valves:
Types “B” and “C” Crispin or Equal____________________
Air Relief Valves:
Type “A” Crispin or Equal____________________
The Bidder further certifies that if his bid is accepted, the base Material Suppliers and
Equipment Manufacturers he has indicated herein will be awarded contracts for supply of their
products unless deductive alternates are provided as specified herein and approved by the Owner.
The Bidder further certifies that deductive alternate Material Suppliers and Equipment
Manufacturers he has properly indicated that are approved by the Owner will be awarded
contracts for supply of their products.
Contractor __________________________________________________
By __________________________________________________
Date __________________________________________________
SPECIAL PROVISIONS
FOR
OWNER APPROVED MATERIAL SUPPLIERS
AND EQUIPMENT MANUFACTURERS
SECTION VII
The below Material or Equipment Manufacturer’s listed are allowed choices the
Contractor may use for the specific material/equipment listed. The Contractor may only use one
supplier/manufacturer of each item below. When the Contractor supplies the Engineer a
submittal for an item, the supplier/manufacturer for the item will be established. Note that not all
items are listed on this page but only select items. Some items require identifying
suppliers/manufacturers in the Bid Documents, some items are identified by standards of quality
in the Specifications and/or Drawings, and some items are specifically listed in the Specification
and/or Drawings. The Contractor shall review all documents thoroughly with his vendors before
preparing his bid and when submitting on any items.
ITEM – MATERIAL OR EQUIPMENT | NAME OF SUPPLIER OR MANUFACTURER |
Ductile Iron Pipe | U.S. Pipe, American, McWane Pipe |
Restrained Joint | Flex Ring or TR Flex |
Fire Hydrants | M&H, American |